adsb.lol

Airport · KGTU

Georgetown Executive Airport at Johnny Gantt Field

United States · 790 ft

Runway diagram

Satellite map with the runway layout of Georgetown Executive Airport at Johnny Gantt Field (KGTU)

Weather

obs 22:55Z · 33 min ago · VFR

Wind
wind 050° 5 kt
Visibility
vis 16 km (10+ SM)
Clouds
SCT 2,600 ft · BKN 3,800 ft · OVC 6,000 ft · ceil 3,800 ft
Temperature
19° / 18° · QNH 1018 hPa (30.06 inHg)
Density altitude
1,300 ft

METAR KGTU 302255Z 05005KT 10SM -RA SCT026 BKN038 OVC060 19/18 A3006 RMK AO2 SLP176 P0003 T01890178

Runway wind

RunwayEndHeadwindCrosswind
11/29112 kt-5 kt
29-2 kt5 kt
18/3618-3 kt-4 kt
363 kt4 kt

negative headwind means tailwind; crosswind is absolute. check the METAR for gusts and variable directions.

Live right now

23 aircraft within 75 km · snapshot 2s ago

CallsignRegistrationTypeAirlineRouteAltitudeSpeedDistanceMap
SKW3669 N256SY E75L Sky West Aviation AUS → DEN → AUS 13375 ft 359 kt 20 km map
N910SR N910SR DA62 N91 4900 ft 169 kt 21 km map
UAL2840 N14219 B738 United Airlines IAH → CMH 10725 ft 274 kt 22 km map
DAL631 N393DA B738 Delta Air Lines SFO → JFK 15875 ft 382 kt 25 km map
ASI515 N823PA P28A Aeroguard Flight Training Center 2900 ft 77 kt 32 km map
UAL439 N77295 B738 United Airlines AUS → DEN 22175 ft 401 kt 34 km map
N949KA N949KA BE30 N94 28025 ft 338 kt 38 km map
SWA3622 N8527Q B738 Southwest Airlines SMF → BWI 6475 ft 230 kt 44 km map
SWA1438 N919WN B737 Southwest Airlines DEN → AUS 3750 ft 212 kt 47 km map
ENY3787 N241NN E75L Envoy Air DFW → MFE → DFW 28000 ft 434 kt 47 km map
DAL1643 N899DN B739 Delta Air Lines JFK → AUS → JFK 6550 ft 270 kt 49 km map
AAL2368 N9017P A319 American Airlines DFW → SAT 26000 ft 435 kt 49 km map
UAL1711 N894UA A319 United Airlines AUS → EWR Ground 12 kt 53 km map
SWA3439 N8629A B738 Southwest Airlines PIT → MCO Ground 12 kt 53 km map
UAL1478 N17312 B38M United Airlines YEG → IAH → IAD 38000 ft 447 kt 55 km map
SKW6185 N896SK CRJ9 Sky West Aviation PHX → BUR → PHX 33000 ft 468 kt 62 km map
N537NG N537NG PC12 N53 13875 ft 219 kt 63 km map
DAL3128 N352NB A319 Delta Air Lines ATL → MSY → ATL 2375 ft 164 kt 65 km map
AAL1505 N334TL B38M American Airlines PHX → LAS 36000 ft 466 kt 68 km map
ASI971 N396AG P28A Aeroguard Flight Training Center 3500 ft 76 kt 68 km map
SWA469 N8861Q B38M Southwest Airlines BNA → CLE 6275 ft 264 kt 72 km map
N5094R N5094R C172 N50 2375 ft 113 kt 72 km map
DAL2323 N830DN B739 Delta Air Lines JFK → AUS → JFK 2900 ft 215 kt 75 km map

Live map

Open the full map

Airport data

Latitude
30.6775
Longitude
-97.6785
Type
small_airport
Region
Texas
GPS code
KGTU
Local code
GTU
Magnetic variation
6.0°
Operations
no PPR
Weather
METAR / TAF

Runways

RunwayLengthWidthSurfaceLighted
11 / 29 4099 ft · 1.25 km · 121° 75 ft ASP yes
18 / 36 5004 ft · 1.53 km · 184° 100 ft ASP yes

Frequencies

TypeDescriptionFrequency
A/DAUSTIN APP/DEP119.000 MHz
AWOSAWOS 3135.425 MHz
CLDCLNC DEL121.100 MHz
UNICCTAF/UNICOM123.000 MHz

Airports near Georgetown Executive Airport at Johnny Gantt Field

Links

imagery © Esri, Maxar, Earthstar Geographics. airport and runway data are public domain. operational flags from OpenAIP (2026-10-29). live positions from the adsb.lol network.